    CLOUD MIGRATION

    Migrate with Minimal Downtime

    Move applications, data, and infrastructure to AWS, Azure, or Google Cloud with dependency mapping, validated data transfer, and planned cutovers that keep your business running.

    Book a scoping call

    How we approach a cloud migration

    Migration Paths
    7Rs

    Rehost, replatform, refactor, and more, chosen per workload rather than one-size-fits-all.

    Cutover Waves
    Phased

    Workloads move in planned waves, with rollback procedures ready at every cutover.

    Data Integrity
    Verified

    Replication and validation checks before and after every cutover.

    Moving workloads in planned, reversible waves

    Each application is assessed, matched to a migration path, and moved in a planned wave, with validation and a rollback plan at every cutover.

    Seamless Cutover

    Minimal-downtime migration strategies for mission-critical applications.

    Workload Optimization

    Right-sizing resources during migration to prevent over-provisioning costs.

    Security in Transit

    End-to-end encryption and validation for all data moving to the cloud.

    Migration Activities

    01

    Workload Discovery

    Catalog applications and map dependencies across your entire on-premise environment.

    02

    Readiness Assessment

    Decide which applications suit cloud-native redesign and which fit a lift-and-shift move.

    03

    Data Replication

    Run secure, throttled data transfers that avoid network congestion during migration.

    04

    Validation & Testing

    Test application functionality and performance in the target environment before cutover.

    05

    Cutover Planning

    Coordinate DNS, database, and traffic switches with rollback procedures and planned windows.

    06

    Post-Migration Review

    Verify performance, security posture, and cost immediately after go-live.

    From Legacy Infrastructure to Modern Cloud — Here's What We Deliver

    Product Design Results
    • Detailed migration strategy
    • Migration risks assessed per workload
    • Minimal disruption approach
    • Protected migration processes
    • Data integrity assurance
    • Compliance-ready transitions
    • Legacy workload modernization
    • Better scalability once workloads land in the cloud
    • Reduced infrastructure complexity
    • Minimized downtime during migration
    • Reliable transition processes
    • Operational stability
    • Performance tuning after migration
    • Cost optimization opportunities
    • Ongoing cloud improvements

    Cloud Migration Roadmap

    2 weeks

    Discovery

    Application dependency map, inventory, and migration wave plan.

    Audit
    Dependency
    4 weeks

    Pilot

    Migration of low-risk workloads to validate the migration path.

    Testing
    Validation
    8–12 weeks

    Migration

    Phased migration of core systems to the cloud.

    Execution
    Transfer
    4 weeks

    Optimize

    Post-migration performance tuning and cost optimization.

    FinOps
    Performance

    Migration scenarios by industry

    Examples of the systems and data that are typically moved to the cloud in each industry.

    Move clinical and administrative systems while keeping patient data intact.

    Inventory of clinical applications and their interfaces before anything moves.
    Encrypted record transfer with an audit log for each batch.
    Rehosting of scheduling and billing systems in low-activity windows.
    Image archive transfer with checksum comparison against the source.
    Parallel run of patient portals before the DNS switch.
    Healthcare
    AWARDS & RECOGNITIONS

    A multi-award-winning software development partner

    OUR WORK

    We've successfully developed hundreds of custom software applications for clients.

    Diversity drives innovation.

    We're building a diverse, equitable, and inclusive team. Not because it's the “right thing to do,” but because it's a necessary building block of our success at HATZS.

    QUICK ANSWERS

    Frequently asked questions

    We choose a path per workload instead of one approach for everything. Each application is assessed to decide whether it suits a lift-and-shift move or a cloud-native redesign, using migration paths such as rehost, replatform and refactor. The decision rests on your dependencies, constraints and business goals rather than a fixed template.

    Workloads move in planned waves, with rollback procedures ready at every cutover. We coordinate DNS, database and traffic switches within agreed windows and run replication and validation checks before and after each one. We cannot promise zero disruption for every system, but this planning is designed to keep it as low as possible.

    Data moves through secure, throttled transfers that avoid congesting your network, with end-to-end encryption and validation for everything in transit. Replication and integrity checks run before and after each cutover, so we can confirm that what arrived matches what left. Your compliance requirements are taken into account when the transfers are planned.

    We start with workload discovery: cataloguing your applications and mapping dependencies across your on-premise environment, then assessing readiness. This produces an inventory and a migration wave plan. Mapping dependencies first reduces surprises later, because a system that depends on something unexpected is far easier to handle on paper than at cutover.

    A post-migration review verifies performance, security posture and cost immediately after go-live. We then tune performance and look for cost optimization opportunities, since right-sizing resources during migration helps prevent over-provisioning. If you want ongoing help, our managed cloud services can continue the work with monitoring and support.

    We do not publish flat rates because no two projects are the same. Every engagement is scoped to your goals and delivered as a Fixed Price project or through a Dedicated Team. The number of applications, their dependencies and the integrations involved all affect scope, so a discovery step comes before any firm commitment.